10 Nov 14, 10:09 am
I would've posted this in the Open forum, however I have no permissions to post there. :pcsmash::fishslap:
Was thinking of holding a CB install and testing party at my shop in North Pole this winter. I figured I'd wait until after the holiday season, to give everyone a chance to spend that time with loved ones.
We can fit at least 2 and up to 4 (if they are small) rigs in there. I have an SWR meter as well as soldering equipment, multimeter, power probe, etc to assist with install.
I wouldn't be against someone working on lighting as well.
If you have a bigger project, let's save that for another time, just don't be afraid to ask.
Any interest in this?
Was thinking of holding a CB install and testing party at my shop in North Pole this winter. I figured I'd wait until after the holiday season, to give everyone a chance to spend that time with loved ones.
We can fit at least 2 and up to 4 (if they are small) rigs in there. I have an SWR meter as well as soldering equipment, multimeter, power probe, etc to assist with install.
I wouldn't be against someone working on lighting as well.
If you have a bigger project, let's save that for another time, just don't be afraid to ask.
Any interest in this?