19 Mar 12, 10:17 am
K-5 (Blaze): Still needs the front DS installed and the PS pump changed. Maybe I can get to it on the 31st. Once it warms up I will be working on bumpers, rocker protection and mounting up the winch.
Burb (Rattle): Gotta change the inside driver's door handle, and fix the lock to the RR door and the rear barn doors. Also have to cover and seal the holes in the right rear that used to have coolant lines to the rear heater that is no longer there. I'm sick of cold air flooding through those... Also need to fix the ignition switch wiring that has a few issues and the heater fan relay which is keeping the HI setting from working.
I've got to get things fixed up for spring wheeling!
Burb (Rattle): Gotta change the inside driver's door handle, and fix the lock to the RR door and the rear barn doors. Also have to cover and seal the holes in the right rear that used to have coolant lines to the rear heater that is no longer there. I'm sick of cold air flooding through those... Also need to fix the ignition switch wiring that has a few issues and the heater fan relay which is keeping the HI setting from working.
I've got to get things fixed up for spring wheeling!