12 Jun 07, 11:46 pm
I got all the front end work done on the 1987 truck; new seals, u-joints, ball joints, brakes, drag link, and tie rod ends. The lift is installed along with new extended brake lines. I ran out of brake fluid while bleeding the brakes, I'll have to finish tomorrow. Then I'll get an alignment and have the new wheels and tires put on. I'll get some before and after pictures tomorrow. Almost ready to wheel. It seems like this build is taking forever, but I was out of town for three weeks.