20 Jul 08, 10:21 pm
lil Chief is now assembled and the front driveshaft is going up to Youngs tomorrow to lengthen and fix the splines. When I slipped the yoke on it at the MP run, it sheared the end off of a few of the splines.
I have to runt he gears through a little bit of break in to make sure that the new pattern takes well.
Going to talk ron into helping wire up the switches and plumb the lines to the locker.
Also on the hunt for some U joint Dana 30 half shafts.
Got the Aussie and the 44 gears so the axle build for that will start some time this month as well.
I have to runt he gears through a little bit of break in to make sure that the new pattern takes well.
Going to talk ron into helping wire up the switches and plumb the lines to the locker.
Also on the hunt for some U joint Dana 30 half shafts.
Got the Aussie and the 44 gears so the axle build for that will start some time this month as well.