03 Sep 08, 07:31 am
It took 6 hours, 7 cut off discs, 4 sawzall blades, and 1 uni-bit, but I think it was worth it. I want to take some 3/8" or 1/2" cold roll and weld it around the wheel well lip to cover the sharp edges. I also want to patch the hole from the swingfire heater on the left front fender. After I do that I'm going to have to give the camo paint job a touch up.