09 Mar 14, 11:15 am
I have asked Eric Troyer to post up his group's letter here.
I have it as a PDF that went out to the Trails Advisory Commission but we can't attach it. They have some good thoughts as several folks in the group know about building sustainable trails. One issue I see with one of the reroute options (to reroute the trail following power lines) could mean property owners may be able to say no to highway vehicles.
Looks like the need for reroute would be 2015..not 2014...so everyone has time to think if DNR allows.
I have it as a PDF that went out to the Trails Advisory Commission but we can't attach it. They have some good thoughts as several folks in the group know about building sustainable trails. One issue I see with one of the reroute options (to reroute the trail following power lines) could mean property owners may be able to say no to highway vehicles.
Looks like the need for reroute would be 2015..not 2014...so everyone has time to think if DNR allows.