13 Jun 07, 09:49 am
Twin_Kings Wrote:My summer is busy, so I'm kind of on a time crunch. How long would it take you to get one fabbed up? How long would you need the truck, if at all? I could do install myself if you build it. What about bushing, can you provide those also?
From ORD's website, the 1 ton shackle flip is different from the 1/2 and 3/4 tons. Must have to do with centering the axle with the 56" springs.
Seeing as they are different, I'd want the truck to do this.
I could possibly come up with a new bushing, I'd just need to look around.
I think it should only take a day to do, if I can clear my schedule, have you swing it by early morning, I can get it back to you by the end of that day. (or you could drop it ioff the night before.)