13 Apr 17, 12:16 pm
I'm going to be in the shop trying to finish Mel's Dodge for the cleanup run.
To do:
Replace one tube seal in disconnect, diff does not need to be removed.
Install add-a-leafs in rear.
Replace steering box.
Fabricate new track bar and mount.
Figure out a front tow point.
Move steering stabilizer mount if there is time.
I also have some work to do to my truck so if anyone can lend a hand it would be appreciated. I should be in the shop by 8:00.
Also if anybody needs to do any small maintenance/repairs to their own rig to get ready you are welcome to come by.
To do:
Replace one tube seal in disconnect, diff does not need to be removed.
Install add-a-leafs in rear.
Replace steering box.
Fabricate new track bar and mount.
Figure out a front tow point.
Move steering stabilizer mount if there is time.
I also have some work to do to my truck so if anyone can lend a hand it would be appreciated. I should be in the shop by 8:00.
Also if anybody needs to do any small maintenance/repairs to their own rig to get ready you are welcome to come by.